A mulch refresh is an afternoon. A retaining wall, irrigation and plant install is a two-week job with a deposit, three draws and a change order in the middle. Operio handles both without a second tool.
14-day free trial · No card required
QUOTE #Q-101128
Hillside Residence
Materials, crews, weather and three progress draws, all in one place or none.
The client adds a wall mid-project, you absorb the cost, and nobody writes it down.
Eighteen shrubs, four yards of mulch, one delivery date, and two of them are wrong.
Double-booked equipment shows up once and one job sits idle.
Deposit and progress got paid, the punch list is done, and the last third goes missing.
Landscape quotes are materials plus labour plus the things that go wrong. Build the estimate with separate material lines (plants by quantity and size, hardscape by square foot or linear foot, soil and mulch by cubic yard) and labour lines by day or crew.
Markup on materials stays visible to you and out of the customer document. Haul-away, permit allowances and equipment rental belong on their own lines so a mid-project surprise does not eat your margin.
Materials and labor stay separate lines, so margin is visible before you send it. Build it as an estimate and convert the accepted one into a scheduled project.
Example ranges, not Operio prices.
Projects block out days, not hours. Schedule a five-day install across the week, assign a crew and the equipment it needs, and keep the weather contingency visible.
If an irrigation sub is coming Thursday, that day is on the same schedule as your own crew rather than in a separate text thread.
Nobody pays a two-week install up front. Take a deposit when the job is booked, bill progress draws at milestones, and hold the final payment until the punch list is done.
Each invoice references the same project, so the customer can see what they have paid against the contract total.
Design approvals, plant lists, warranty terms on plantings and the maintenance plan you will sell them next season. All of it stays on the customer record, which is how a one-time install turns into a recurring maintenance account.
Estimate a softscape or hardscape line before the site visit with the free quote calculator.
Installation and maintenance usually live in the same business, so the same records run lawn care routes and fence installs.
See how customer records workAn illustrative run-through — not a real customer, just how the pieces connect.
Sod, wall, irrigation and plants go in as four material groups plus labour days, and the quote totals itself.
A deposit invoice goes out, the five days are blocked on the calendar, and the skid steer is assigned to the first three.
Wall and irrigation are done, so a progress invoice goes against the same project total.
The last draw is billed only once the walkthrough is signed off, and the maintenance plan goes on the customer record.
A single install pays for a year of it.
3 customers, 2 quotes a month, 3 jobs. Fine for a maintenance round.
Cancel anytime. Secure payment processed by Stripe.
Yes. Materials, labor, equipment and disposal can each be their own line with their own unit.
Yes. A deposit invoice, progress invoices at milestones and a final invoice all reference the same project.
Revise the quote or add a line to the project and issue the difference as its own invoice, so the change is documented.
Yes. Material and expense lines attach to the job, which keeps job cost visible against the quoted number.
Yes. Jobs are assigned individually, so two crews can run two sites on the same date.
Bill a progress draw at the end of the first period and the remainder later. Both invoices point to one job total.
Yes. An accepted quote becomes a scheduled job without retyping the scope.
Yes, 3 customers, 2 quotes per month and 3 jobs per month. Project work usually moves to Starter at $29/mo.
How other landscaping operators price and quote the work.
Free tools: quote calculator · quote template · invoice template